DePaul University – School of Music Holtschneider Performance Center

  • area / size 185,000 sqft
  • Completed 2018
  • Antunovich Associates were tasked with completing the elaborate School of Music Holtschneider Performance Center at DePaul University in Chicago, Illinois.

    The 185,000 square foot Holtschneider Performance Center is the first phase of a new music complex for the DePaul University School of Music, serving as the eastern gateway to the Lincoln Park Campus. The new structure anchors the updated complex, sitting on the site once occupied by McGaw Hall, located between the School of Music administration building to the north and Concert Hall to the south, which are slated to be renovated in future phases of the project. The Holtschneider Performance Center houses several performance spaces including the 505-seat Mary Patricia Gannon Concert Hall, the 140-seat Murray and Michele Allen Recital Hall, the 80-seat Brennan Family Recital Hall, and the 75-seat Mary A. Dempsey and Philip H. Corboy Jazz Hall. The main entrance to the building is located adjacent to a circular motor court, which allows for efficient passenger drop-off and provides access to lower level parking. The three-story atrium, known as Schaefer College Hall Lobby, greets visitors entering the venue and serves as a circulation spine which helps to organize the programmed spaces of the building. This “interior street” is the eastern gateway to DePaul’s Lincoln Park Campus, open and accessible to all. Student rehearsal rooms, practice rooms, and classrooms are strategically organized on the upper floors by the required functional and acoustic adjacencies relative to the double and triple height performance spaces rising from the floors below. The building’s facade complements its surroundings and is composed mainly of brick with stone panels and horizontal coursing as detail elements. Glass and stone, used throughout the exterior, are arranged to moderate the building’s mass and present a lively atmosphere along Halsted Street. The building height is reduced at the edges through setbacks in the main volume to mediate between the required concert hall height and the surrounding residences.

    Architect: Antunovich Associates
    General Contractor: Bulley & Andrews
    Photography: Mark Ballogg